Choose the operator and placement together
In pharmacy, technicians can test collected waste, conduct mobile audits, and support targeted testing. At the point of care, clinicians waste medication directly into WasteWitness.
Walk through the proposed placement with the staff who will use it. Discuss access, power and network requirements, space around the device, and routine access to the rinse and waste containers. For a mobile audit, include the locations and transport arrangement in that discussion.
Plan authentication and connectivity
Review your hospital’s preferred sign-in method with PharmID and IT. Confirm the intended users, administrator access, and the information needed to associate testing with the relevant waste event.
WasteWitness does not require an EHR integration. Connecting medication records can improve the workflow, particularly at the point of care. If integration is part of your plan, confirm the supported systems, fields, and implementation scope before relying on automated data exchange.
Train each team for its role
Clinicians need to understand sign-in, medication selection, wasting, and the acceptance confirmation. Once waste is accepted, they can return to care while the device completes analysis.
Wasting typically takes less than 60 seconds per drug. Total interaction time depends on the number of drugs and the amount being wasted. Measure that separately from the time needed to analyze the waste and make results available.
Pharmacy technicians also need the hospital’s collection and sample-tracking process. Authorized administrators need to understand the result categories, event context, and follow-up responsibilities.
Assign daily ownership
Routine supplies are distilled water for cleaning and the waste container. Assign responsibility for checking and replenishing supplies, managing the container, and contacting support when needed.
Name the people who will review results and coordinate follow-up. Before expanding, revisit staff feedback, routine workload, and the evaluation measures your team agreed on.
